We are pleased to announce that part number DD101 LONG LEAD with NSN 5910006788157 under 5910 Capacitors, is now ready to ship. Manufactured by Crl Components Inc under CAGE Code 71590 this part is a; Capacitor Fixed Cer. Are you interested in a quick quote for DD101 LONG LEAD part number? Simply fill out the form below to begin. Your quote will take into account your answers to the fields “Needs Parts By” and “Quantity” in particular. An account manager will respond to your RFQ by email or by phone within 15 minutes of receiving this form.
Note : We will not share your information to any third parties.
Aviation Distribution, owned and operated by ASAP Semiconductor, is a premier supplier of NSN parts, with more than 2 billion NSNs in stock. We are an AS9120B, ISO 9001:2015, and FAA AC 0056B accredited company ready-to-ship parts and prime presence in multiple locations across the US and Canada, we can fulfill your requirements quickly and efficiently. Same day shipping and next day shipping are some of the expert services that we offer.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-678-8157 Item Description: Capacitor Fixed Cer | 5910 | 006788157 | 0 | P | ||
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | 0 | ||||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Dd101 Long Lead | 1 | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES, RADIAL TERMINALS |
AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
AGAV | END ITEM IDENTIFICATION | MISSILE, AI-TO-AIR, PHOEB=NIX (AIM-54); TELETYPE, MODEL 28; TEST CONSOLES, MINI-SACE; ENGINE, AIRCRAFT TF33-PW-102 (C-135E, EC-135H/K/P); MISSILE, AIR-TO-AIR, SPARROW (AIM-7); SUPPORT EQUIPMENT, MX PEACEKEEPER MISSILE; SUPPORT EQUIPMENT, B- |
CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0/+22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
DD1-0 | DD1-00 | DD1-00 | DD1-5 |
DD1-50 | DD1-508 | DD1-B0-34-610-1G2-C | DD10 |
DD10-0 | DD100 | DD100 | DD100 |
DD100 | DD10000 | DD10018-1 | DD1003 |
DD10030300 | DD10040300 | DD10050300 | DD100T |
DD101 | DD101 | DD101 | DD101 |
Don’t forget, If You Want to Get A Competitive Quote for Parts Within Fifteen Minutes, You Can Simply Fill Out and Submit the Request for Quote Form.
Request for Quote